Disneyland Update - August 8, 2000
Page 14 of 21
Parking - Page 1
The first four floors of the new parking structure have opened.

The tram loading area for the structure


The loading area

The escalators. Stairs and an elevator are also available.

Each level is named after a character.

Inside the structure